Construction quality team reviewing project plans at a federal facility

General Construction · Construction Management · QCM / SSHO Services

Federal construction. Managed with control.

Integrated construction, project-management, quality-control, and site-safety support for federal and public-sector projects.

WOSBWBESDBSBUEI: YSSNR93AGZH6CAGE: 6NMY9

Built for NAVFAC & USACE Execution

Every definable feature of work. All three phases of control.

G Adams Group helps NAVFAC and USACE contractors operate disciplined quality and safety programs from mobilization through closeout. The Quality Control Manager (QCM) / Site Safety and Health Officer (SSHO) team coordinates complementary responsibilities: the quality-control role plans and documents the preparatory, initial and follow-up phases for each definable feature of work, while the safety role leads site safety and health compliance—before deficiencies or hazards become rework, delay, rejection or injury.

Our model centers on the essential professionals federal construction projects depend on: QCM / SSHO personnel, alternates and project-support professionals who understand secure, occupied and mission-sensitive facilities.

Core Services

Three service lines. One accountable team.

01

General Construction

Federal and public-sector construction delivered with disciplined field coordination, subcontractor management, schedule control, documentation, and closeout.

02

Construction Management

Project planning, contract administration, owner representation, coordination, compliance oversight, progress tracking, and closeout support from mobilization through acceptance.

03

QCM / SSHO Services

Qualified Quality Control Manager and Site Safety and Health Officer support, including NAVFAC and USACE three-phase control, QC plans, submittals, testing, deficiency tracking, daily reporting, and alternate coverage.

The NAVFAC & USACE Three-Phase System

Control the work before it becomes a problem.

The QCM / SSHO team integrates quality control with site safety and health. The quality-control manager applies all three control phases to every definable feature of work and maintains the evidence NAVFAC and USACE need to verify compliance, while the site safety and health officer monitors safety requirements throughout execution.

1

Preparatory Phase

Before work starts: review specifications, approved submittals, drawings, materials, testing, safety requirements, qualifications and the planned method of construction.

2

Initial Phase

At the start of work: verify the approved approach in the field, establish the required workmanship standard and resolve differences before production continues.

3

Follow-Up Phase

Through completion: inspect ongoing work, verify testing, document results, track deficiencies and confirm corrections for acceptance.

About G Adams Group

Federal experience built from the ground up.

Founded by Selina Freytas in 2009, G Adams began its government-contracting journey through HUD’s Neighborhood Stabilization Program. That early work established a lasting commitment to public-sector performance, small-business participation, and disciplined project delivery.

Since then, G Adams has procured more than $50 million in construction-related materials and services and supported work for the Department of the Navy, National Guard, Department of the Air Force, U.S. Army Corps of Engineers, General Services Administration, Drug Enforcement Administration, United States Postal Service, and public-sector clients.

Today, G Adams Group brings that experience together through three integrated service lines: General Construction, Construction Management, and QCM / SSHO Services, including three-phase control and safety support for NAVFAC and USACE work.

Federal Experience

Experienced where performance matters most.

G Adams Group brings federal construction experience supporting work associated with GSA, the U.S. Air Force, the U.S. Navy and the U.S. Army Corps of Engineers.

We understand that on federal projects, quality, safety, documentation and communication are inseparable—and that the absence of qualified project leadership can stop production.

Request our capability statement →
GSAUSAFUS NAVYUSACE

Who We Support

A reliable quality partner for the contractors carrying the risk.

Why G Adams

Staffing the roles your federal project cannot operate without.

As experienced prime contractors and construction managers, we know that qualified QCM / SSHO leadership is key to the successful delivery of NAVFAC and USACE projects. When these positions are required, the project cannot operate without dependable coverage. That is why G Adams Group specifically provides project-ready QCM / SSHO services for traveling prime contractors—helping them mobilize with the quality-control and site-safety leadership their federal contracts demand.

01

Less Administrative Burden

Support with candidate sourcing, qualification review, onboarding coordination, and project-specific personnel requirements.

02

Less Project Disruption

QCM / SSHO and alternate-coverage planning designed to reduce the risk of work stopping because an essential position is unfilled.

03

Stronger Compliance

Quality leadership aligned with preconstruction requirements, three-phase control, daily documentation, deficiency tracking, and closeout.

04

More Focus on Production

A dedicated quality resource helps the superintendent and project team concentrate on safe, efficient field execution.

Start the Conversation

Tell us where the project is and what the contract requires.

Share the location, agency, anticipated start date and QCM / SSHO qualification requirements. We will review the need and respond directly.